Puerta de Hierro – Cruz del Viso · PR85 UF2
Geotechnical exploration campaign and inclinometer installation at critical point PR85 of the corridor.
Corporate experience
- 70 m
- HQ drilling (96 mm)
- OD 70 mm
- Inclinometer casing
- Client
- Sociedad Concesionaria Vial Montes de María
- Location
- PR85 · UF2 · Carmen de Bolívar – San Jacinto (Bolívar) · Colombia
- Period
- Oct. 2023 – Nov. 2023
- Type of work
- Exploration and instrumentation
- Status
- Completed
- Type of experience
- Contract executed by GEOTECNIA & TÚNELES S.A.S.
Technical scope
Geotechnical exploration campaign at PR85 of Functional Unit 2 of the Puerta de Hierro – Cruz del Viso road corridor (National Route 2515).
HQ core drilling, sample logging by a geologist, testing in an ONAC-accredited laboratory, and installation of inclinometer casing with periodic readings at the critical point.
Gallery
Illustrative diagram. The project’s photographic record will be published once authorized by the client.
Let’s talk about your project
Let’s build solutions for your next project
Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.
