Skip to content
Exploration and instrumentation

Puerta de Hierro – Cruz del Viso · PR85 UF2

Geotechnical exploration campaign and inclinometer installation at critical point PR85 of the corridor.

Corporate experience
70 m
HQ drilling (96 mm)
OD 70 mm
Inclinometer casing
Client
Sociedad Concesionaria Vial Montes de María
Location
PR85 · UF2 · Carmen de Bolívar – San Jacinto (Bolívar) · Colombia
Period
Oct. 2023 – Nov. 2023
Type of work
Exploration and instrumentation
Status
Completed
Type of experience
Contract executed by GEOTECNIA & TÚNELES S.A.S.

Technical scope

Geotechnical exploration campaign at PR85 of Functional Unit 2 of the Puerta de Hierro – Cruz del Viso road corridor (National Route 2515).

HQ core drilling, sample logging by a geologist, testing in an ONAC-accredited laboratory, and installation of inclinometer casing with periodic readings at the critical point.

Gallery

Illustrative diagram. The project’s photographic record will be published once authorized by the client.

Let’s talk about your project

Let’s build solutions for your next project

Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.