Puerta de Hierro – Cruz del Viso · PR49 UF1
Exploration and instrumentation with inclinometers and vibrating wire piezometers at a critical point of the corridor.
Corporate experience
- Client
- Sociedad Concesionaria Vial Montes de María
- Location
- PR49 · Functional Unit 1 · Colombia
- Period
- Jun. 2024 – Oct. 2024
- Type of work
- Exploration and instrumentation
- Status
- Completed
- Type of experience
- Contract executed by GEOTECNIA & TÚNELES S.A.S.
Technical scope
Geotechnical exploration, instrumentation installation and follow-up at a critical point of the road corridor.
Drilling, SPT and sampling; inclinometers and vibrating wire piezometers; control points and monitoring campaigns; associated laboratory testing.
Gallery
Illustrative diagram. The project’s photographic record will be published once authorized by the client.
Let’s talk about your project
Let’s build solutions for your next project
Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.
