Skip to content
Instrumentation and monitoring

Ituango Hydroelectric Project · Geotechnical instrumentation

Network of 14 instruments for slope monitoring: inclinometers up to 80 m deep and vibrating wire piezometers.

Corporate experience
370 m
5 inclinometers (70 and 80 m)
180 m
3 open standpipe piezometers
380 m
6 vibrating wire piezometers
Client
ESTYMA Estudios y Manejos S.A. · EPM project
Location
Ituango, Antioquia · Colombia
Period
Jul. 2025 – Jan. 2026
Type of work
Instrumentation and monitoring
Status
Completed and closed out
Type of experience
Contract executed by GEOTECNIA & TÚNELES S.A.S.

Technical scope

Drilling and installation of a geotechnical instrumentation network for slope monitoring.

Inclinometers, open standpipe piezometers and dual-sensor vibrating wire piezometers. Works accepted and contract closed out in 2026.

Main geotechnical challenges
  • 01Installation of instruments at depths of 60 to 80 m
Solutions implemented
  • 01Drilling and installation on site by the same team responsible for the readings
Gallery
Reservoir and treated slope in the project area
Reservoir and treated slope in the project area
Drilling platform for instrumentation
Drilling platform for instrumentation
Drilling rig and safety barriers on the platform
Drilling rig and safety barriers on the platform
Hillside drilling for instrument installation
Hillside drilling for instrument installation
Drilling rig at the work front
Drilling rig at the work front
Geotechnical instrument installation
Geotechnical instrument installation
Drilling crew on the platform
Drilling crew on the platform
Geotecnia & Túneles team on site
Geotecnia & Túneles team on site
Let’s talk about your project

Let’s build solutions for your next project

Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.