Collector tunnel · Stormwater System Expansion
Engineering design of a collector tunnel (2022–2023) and, since 2025, technical direction and engineering technical assistance during its NATM construction.
- NATM
- Construction method
- 2022–2023
- Engineering design
- 2025–now
- Technical direction and assistance
- Client
- Private contractor
- Location
- Guatemala
- Period
- 2022 – present
- Type of work
- Hydraulic tunnel · Underground works
- Status
- In progress
- Type of experience
- Contract executed by GEOTECNIA & TÚNELES S.A.S.
Technical scope
Stormwater collector tunnel and associated works in an urban setting.
The company prepared the engineering design of the tunnel between late 2022 and early 2023 and, since 2025, has provided technical direction of the works and engineering technical assistance during construction. Due to confidentiality commitments with the client, detailed technical information will be published once the works are completed.
Engineering design · late 2022 – early 2023
Company contract
Engineering design of the tunnel and its associated works: geological-geotechnical, geometric, structural and hydraulic components.
Technical direction and assistance · 2025 – now
Company service
Technical direction of the NATM works and engineering technical assistance in hydraulics, structures, geometry, geology and geotechnics.
- 01Underground construction in an urban environment
- 02Adapting the design to the actual conditions encountered during excavation
- 01Recalculation and adjustment of support sections according to ground conditions
- 02Design and construction procedure optimizations
- 03Continuous technical follow-up of construction progress




Let’s build solutions for your next project
Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.