Pamplona, Pamplonita and La Honda tunnels · 4G Corridor
Head of geology and geotechnics for three tunnels, two of them with an emergency gallery.
Track record · Technical Direction
- 1,400 m
- Pamplona tunnel + gallery
- 1,060 m
- Pamplonita tunnel + gallery
- +9,000 m
- Coordinated drilling
- Client
- Sacyr Ingeniería e Infraestructuras
- Location
- Norte de Santander · Colombia
- Period
- Dec. 2017 – Jul. 2022
- Type of work
- Road tunnels
- Status
- Professional experience
- Type of experience
- Professional track record of the Technical Director, prior to or alongside the company (not company contracts)
Technical scope
Direction and supervision of the engineering and on-site follow-up of the tunnels of the Cúcuta-Pamplona 4G corridor.
Coordination of geology and geotechnics, instrumentation (inclinometers, piezometers, convergence, automated in-place inclinometer-extensometers) and cost tracking of the underground works before the ANI (National Infrastructure Agency).
Gallery
Illustrative diagram. The project’s photographic record will be published once authorized by the client.
Services applied
Let’s talk about your project
Let’s build solutions for your next project
Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.
