Canal del Dique · Phase I geotechnical exploration
Campaign of 2,645 m of HQ drilling on firm ground, floodplains, mud and channel bed, with geophysics and pumping tests.
Corporate experience
- 2,645 m
- HQ drilling (96 mm), up to 45 m deep
- 320 m
- Drilling for VW piezometers
- 2 × 40 m
- 8" pumping wells
- Client
- Sacyr Construcción Colombia S.A.S.
- Location
- Atlántico and Bolívar · Colombia
- Period
- May 2023 – May 2024
- Type of work
- Geotechnical exploration · Hydrogeology
- Status
- Completed and certified
- Type of experience
- Contract executed by GEOTECNIA & TÚNELES S.A.S.
Technical scope
Drilling, in-situ and laboratory testing, instrumentation, seismic refraction and pumping tests.
SPT, Shelby, vane shear, disturbed and undisturbed sampling, vibrating wire piezometers, two seismic lines and two pumping wells. 100 % of the contracted items executed; contract closed out in 2024.
Main geotechnical challenges
- 01Exploration in floodplains, mud and the channel bed
- 02Integrating geotechnics, geophysics and hydrogeology in a single campaign
Solutions implemented
- 01Logistics and safety plan for each type of work front
- 02Pumping tests and piezometric network for hydraulic characterization
Gallery
Illustrative diagram. The project’s photographic record will be published once authorized by the client.
Let’s talk about your project
Let’s build solutions for your next project
Every project presents its own challenges. Our goal is to understand your needs and develop sound technical and construction alternatives.